Prerequisites
- Access to Bolt in your Paradime workspace.
- A scheduler connection to your warehouse (your production connection).
- At least one materialized model in your project.
Prefer configuration as code? Bolt also supports YAML-based schedules.
Steps
1
Create a new schedule
Open Bolt from the Paradime home screen, select + New schedule, then + Create new schedule.
2
Configure the schedule
Fill in the required fields, add any optional ones, then select Save to publish. This guide covers a Standard schedule; see schedule types and triggers for Deferred and Turbo CI.
The schedule appears in your Bolt schedules list. Trigger a manual run from its detail view to confirm it executes and reports the status you expect.
Next steps
Schedule types and triggers
Standard, Deferred, and Turbo CI, and how each trigger works.
Set up notifications
Alert your team on passed or failed runs.
Schedules as code
Define schedules in YAML instead of the UI.
Bolt reference
Full schedule anatomy and settings.